Tanzhou, Zhongshan · 54,111 m² Plant
rfq@pinchuangmold.com
PINCHUANG Precision Molding & OEM
Baby Care OEM · 17.55M pcs/yr Declared Capacity

PPSU & PP Baby Bottle, LSR Nipple & Electric Breast Pump Manufacturer

One integrated facility combining 4 one-step ISBM machines, 16 food-grade LSR presses, 70+ injection presses, and proprietary baby-feeding R&D (including patented sliding-silicone straw sleeves).

ONE-STEP ISBM · 4 UNITS

PPSU & PP Baby Bottles

40 t/yr PPSU and 780 t/yr PP declared throughput. High-clarity amber PPSU withstands repeated 180 °C steam sterilization without crazing or BPA concerns.

FOOD-GRADE LSR · 16 UNITS

Nipples, Valves & Straws

Platinum-cured liquid silicone with controlled post-bake vulcanization. Precision Sodick wire EDM shutoffs eliminate flash around micro anti-colic vents.

ELECTROMECHANICAL OEM

Electric Breast Pumps & Tableware

Turnkey assembly covering molded housings, soft LSR breast shields, PCB/pump soldering, adhesive dispensing/curing, and ultrasonic housing welding.

Technical Deep Dive
PPSU One-Step vs. Two-Step ISBM: Clarity, Thread Precision & Hygiene
Read Engineering Guide →
Technical FAQ

Frequently Asked Engineering Questions

Why do you use one-step ISBM instead of two-step blow molding for PPSU baby bottles?

One-step ISBM molds the preform, conditions it, and stretch-blows the final bottle inside one enclosed machine—preventing preform scuff marks, airborne dust contamination, moisture absorption in PPSU, and oval neck-thread distortion.

Can you manufacture both the PPSU/PP bottle body and the LSR silicone nipple in-house?

Yes. We run 4 one-step ISBM machines (40 t/yr PPSU and 780 t/yr PP declared capacity) alongside 16 dedicated food-grade LSR presses (62 t/yr silicone) with oven post-curing, guaranteeing leak-free collar-to-nipple fit.

Do you also manufacture electric breast pumps and feeding tableware?

Yes. Our baby care vertical (17.55M units/yr declared capacity) spans baby bottles, molded feeding tableware, and electric breast pumps—including PCB/motor soldering, adhesive curing, and ultrasonic welding.

Free Engineering Review

Send Your 3D STEP / IGES Files for a 24-Hour DFM & Quote

Our tooling engineers review draft angles, gate locations, wall-thickness uniformity, and 2K/LSR bond feasibility before you commit to steel.

✓ Mutual NDA on request ✓ 180 in-house molds/yr ✓ Direct factory engineering team