Built on Precision Tooling Since 2012—Expanded for Global OEM Scale
Pinchuang Intelligent Technology (Zhongshan) Co., Ltd. (formerly Zhongshan Pinchuang Plastic Products Co., Ltd.) combines over a decade of precision mold engineering with a new 54,111 m² intelligent manufacturing base in Zhongshan, Guangdong.
Why Global Brands Work With an Integrated Contract Molder
Starting in 2012 with precision plastic mold making and thermoplastic injection, Pinchuang grew by solving hard manufacturing interfaces: sealing liquid silicone to rigid polymers, eliminating flash on thin-walled baby feeding valves, and integrating electromechanical assembly under tight dimensional tolerances.
In 2025, we scaled into our RMB 181 million facility at No. 2 Xingteng Road, Tanzhou Town—expanding to 54,111 m² across two six-story manufacturing buildings with an 800-person workforce capacity and full Kingdee Cloud Galaxy ERP digitization. Located in the Greater Bay Area minutes from Zhuhai and within easy port access to Shenzhen, Guangzhou, and Hong Kong, our plant serves over 30 global brands across consumer electronics, baby care, oral care, and personal wellness devices.
In-House R&D & Intellectual Property Discipline
Our engineering team develops practical structural innovations—including patented sliding-silicone hygienic straw assemblies for baby bottles and mechanical folding mechanisms—and operates strictly under customer NDA protection for every private-label OEM program.
- Legal Entity
- Pinchuang Intelligent Technology (Zhongshan) Co., Ltd.
- Established
- April 26, 2012 (Registered Capital: RMB 10M)
- Facility Address
- No. 2 Xingteng Road, Tanzhou Town, Zhongshan, Guangdong, China
- Campus Footprint
- 15,204 m² land · 54,111 m² floor area · 800 staff capacity
- Government Recognition
- National High-Tech Enterprise · Guangdong Specialized SME
- Digital Operations
- Kingdee Cloud Galaxy ERP (Production & Finance Integrated)
Send Your 3D STEP / IGES Files for a 24-Hour DFM & Quote
Our tooling engineers review draft angles, gate locations, wall-thickness uniformity, and 2K/LSR bond feasibility before you commit to steel.